Newark, NJ-- 21:19 hrs 57 Crane Street 2nd Alarm. Battalion Chief-3 arrives on-scene with heavy fire from the top floors of a 3 story vacant house. Battalion Chief-3 reports all arriving companies will be using defensive operations, requests 3rd & 4th due engines report to the D side for exposure protection.
Deputy-1 arrives on scene assumes command reports fully involved structure requests additional Signal 9 above the working fire. Deputy-1 shortly after orders the 2nd alarm filled out, companies operating multiple lines at this time.
Deputy-1 reports main body of fires darkening down with near total collapse of the structure. Around 21:54 hrs Deputy-1 reports no extension to the exposures fire is U/C with a extended overhaul operation.
Northeast Bravest Pictures: http://tinyurl.com/l5ozmsa
Facebook Page: https://www.facebook.com/BuffingTheBravest
Tags:
Add a Comment
© 2024 Created by Firefighter Nation WebChief. Powered by
You need to be a member of My Firefighter Nation to add comments!
Join My Firefighter Nation