Buffalo Firefighters responded early this morning for a report of a structure fire on Roetzer Ave. Engine 31 went on location with a 1 1/2 story dwelling going good. B-43 reported the vacant structure fully involved and defensive operations were to be used. Ladder 14 & Ladder 6 set up aerial operations & 2 1/2 inch hose lines were used. The fire was under control in 38 minutes. The cause is under investigation & damages are listed at $45,000.
You need to be a member of My Firefighter Nation to add comments!
Join My Firefighter Nation