First Due Friday; Heavy Fire on 2 Floors (Videos)

This week we've got a rippin' 2-story single family dwelling.  Share your strategies, tactics and experience! 

CLICK HERE TO SEE THE VIDEO!

Views: 128

Add a Comment

You need to be a member of My Firefighter Nation to add comments!

Join My Firefighter Nation

Comment by Michael McCarthy on January 30, 2012 at 1:17pm

preliminary report: 2 story wood frame 25 x 60  heavy fire showing 1st and 2nd floor. 2 - 2-1/2's going into operation - requesting tower ladder (if not already coming) and additional engine and ladder." This would be a defensive operation from the exposure 1 side (assuming that where the fire is going to be exposure 1). If their is a known life hazard I might try to get in from the exposure 3 side for a very limited search depending on the fire condition. That house is gone---better get to the exposure and check that for fire especially with that wind.

Find Members Fast


Or Name, Dept, Keyword
Invite Your Friends
Not a Member? Join Now

© 2024   Created by Firefighter Nation WebChief.   Powered by

Badges  |  Contact Firefighter Nation  |  Terms of Service