2-19-2011 working fire in a 4 story residential over commercial building in downtown winsted ct call came in at approx. 6pm engine2 was first due stretching a 2 1/2 into the store front on the first floor witch was heavily involved in fire a second 1 3/4 line was streched and put into opperation fire was contained in approx 15 min and overhaul began the only things that saved the building were the agressive interior attack and the three layers of drywall covering a 3 foot void between the new ceiling and old that ran the leangth of the building
You need to be a member of My Firefighter Nation to add comments!
Join My Firefighter Nation