Permalink Reply by Russ on November 4, 2010 at 9:56pm
while on vacation helped a dept rig to do a horizontal lift of a stokes from a three story building under construction of a pt with a fall back injury. (no stairs in the bldg except roughed in set that were not safe). used an aerial to do the lift and compleated the op from arrival to ambulance in 30 minutes