This scenario was recently posted on;
http://www.firefighternation.com/forum/topics/garden-apartment-fire...
The incident is as follows;
You've got a Four (4) Story Wood Frame Garden Apartment Building Fire, with a working and progressing fire on the number four floor (C-D). The fire has extended into the truss loft of the roof and is traveling rapidly.

Its 08:30 hours on a Saturday morning. The building is occupied, with some residents self evacuating. There are no present reports of any civilians in distress (yet). You have a very good box alarm assignment consisting of; Four (4) Engine Companies, Two (2) Truck Companies, Two (2) Heavy Rescue Companies, Two (2) EMS ALS Ambulances, along with Two (2) Battalion Chiefs, A Shift Commander and a Safety Officer (Boy are you lucky today..). Staffing is 4 personnel on the Engine and Truck, 5 staffing on the Rescue, 2 on the EMS units. Additional alarms bring in a 3 and 2 assignment along with two additional chiefs per alarm. Additional Rescues on special call.

The Apartment complex was built circa 1982, wood frame, brick veneer facing, truss roof system w/ plywood decking and solid wood floor joists w/ plywood sub-flooring. Weather conditions do not contribute to any issues at this alarm.

You’re arrived and all hands are working on the first alarm assignment. You find the BC who has established command on the Alpha side, and begin a status report. Companies are transmitting and requesting immediate resources. There are some initial reports coming in on fire extending past the fire wall on the number 4 floor and dropping into other apartment units. There's fire reported on the number three floor (C-D). (see photo)

The assignment on the Forum section was from a Command perspective. In this Group, lets take the perspective on Building Performance, Risk Assessement and Safety. Based upon the scenario and also based upon what the postings on the Strategy & Tactics Forum are saying; Let's discuss how the building is expected to perform and what are the issues taht would affect and influence the Incident Commander. We're running the same sceanrio on under two postings- BUT from different perspectives and focal points.

Let's try this out and see what we can pull from the incident and discuss....come on!, We've got ALL HANDS WORKING, Conditions are doubtful, gimme a second alarm....

More communications from interior operations as we progress….

Views: 19

Find Members Fast


Or Name, Dept, Keyword
Invite Your Friends
Not a Member? Join Now

© 2024   Created by Firefighter Nation WebChief.   Powered by

Badges  |  Contact Firefighter Nation  |  Terms of Service