man! Does anybody come in here? Anyway, I'm pondering hose layout.
Some places I've heard of use something like a couple lengths of 2.5 connected to a couple of 1.75. The way I understand it is this increases nozzle pressure over long layouts. I'm wondering if this might help out my department since we're going to have some industrial occupancies soon. I was thinking a split bed of this and one of straight 2.5. The problem is we don't have the kind of guaranteed water supply some of these places do. We have a few hydrants (flow unknown) and have to water shuttle in other places.
Oh yea, in case you didn't notice, i don't know shiite about hydraulics. It makes my head hurt.
Tags: