Pine Hill FD 2nd Alarm Structure Fire w/ FF Down - 30 Long ave

** Cheektowaga NY **
PD on scene with a report of something exploded in a garage extending into the dwelling. Pine
Hill 7-3 confirmed working fire from the firehouse. Clevehill 9 on scene with fully involved
garage. Pine Hill 7-3 reports fire now into both attics. 1 FF down on 2nd floor when a ceiling
gave way - Synder FAST activated. U-Crest called in to ventilate roof, Sloan crews overhauled in
primary house. Hy-view, Cleve Hill & Rescue Crews attacked and overhauled #4 side exposure.
5 -1¾ & 3 -2½" Lines in use
ON Scene:
Pine Hill: Truck 6 & Rescue 7; Cleve Hill: Engine 3
Rescue: Engine 1; Hy-View: Truck 6; Forks: Engine 1
U-Crest: Engine 3; Sloan: Engine 1 & Snyder FAST: Rescue 5
Bellevue filled in at Pine Hill with Engine 2
Damages: $ 175K
4-3-2016 - Time Out: 15:53 hrs

Views: 108

Add a Comment

You need to be a member of My Firefighter Nation to add comments!

Join My Firefighter Nation

Find Members Fast


Or Name, Dept, Keyword
Invite Your Friends
Not a Member? Join Now

© 2024   Created by Firefighter Nation WebChief.   Powered by

Badges  |  Contact Firefighter Nation  |  Terms of Service